Perawatan dan Perbaikan dengan Pengelasan Teknologi Robotik secara Preventive maintenance dengan Modulary Design

Authors

  • Hisyam Jurusan D3 Teknik Mesin, Universitas Halu Oleo
  • Muhamat Farisman Jurusan D3 Teknik Mesin, Universitas Halu Oleo
  • Jusman Jurusan D3 Teknik Mesin, Universitas Halu Oleo
  • Raden Rinova Sisworo Jurusan Teknik Mesin, Pendidikan Vokasi, Universitas Halu Oleo
  • Aminur Jurusan Teknik Mesin, Pendidikan Vokasi, Universitas Halu Oleo

DOI:

https://doi.org/10.55679/pistonjt.v10i1.89

Keywords:

Product defect, Welding, Maintenance, Industry, Parts

Abstract

The focus of this research was maintenance and repair of robotic welding technology using preventive maintenance with modular design. This concept organizes machine parts to reduce manufacturing costs, repair procedures, and reduce product defects, as well as minimize component damage such as undercut, overlap, and porosity. If component damage occurs, maintenance/replacement of components is not only carried out on the damaged component but also is connected to other components. The method used in this research was observation carried out by direct observation at the location of the information source at the company Showa Kinzoku.co.,ltd, as well as literature study in order to obtain complementary data and solve problems. This shows that there was a significant decrease in damage after research was carried out before maintenance was carried out in November {13.0}, December {12.3}, January {12.5}. After maintenance was carried out in February {4.12}, March {3.33}, April {3.76} the difference was very significant. In this research the author also looked at seasonal factors, in the winter in December product damage reached {12.5} damage and in the summer in April it decreased to {3.76} damage. Based on the results of the analysis, it can be concluded that the implementation of preventive maintenance with modular design is very effective, the January presentation data showed 77% damage, compared to April's only 23% damage. Maintenance significantly reduces average product defects by more than 50%, demonstrating high effectiveness in this period.

Downloads

Download data is not yet available.

References

Rizqianto, I., Pradigdo, D., Setyabudi, I., “Rancang Bangun Konstruksi Lengan Robot Pada the Design and Construction of Robotic Arm”. 1–10, 2020

Purnomo, F. H., & Pribadi, T. W., “Analisis Teknis Dan Ekonomis Kombinasi Pengelasan Robotic Welding Dengan Welder Konvensional Pada Sambungan Pipa Struktur Jacket Bangunan Lepas Pantai”, Jurnal Teknik ITS, 6(2), G266-G271, 2017.

Altehmazi, M. M., Suliman, S. M. A., & Alalawi, Y., “An Optimization Approach to the Preventive Maintenance Planning Process”, Modern Applied Science, 11(9), 20, 2017. https://doi.org/10.5539/mas.v11n9p20

Fauziyyah, A., & Sriyanto, “Analisis Perhitungan Biaya Perawatan sebagai Dasar Evaluasi Penggantian Mesin CTCM”. Jurnal Teknik Industri, 4(1), 1–7, 2016.

Rahmadi, M., & Zetli, S, “Analisis Total Preventive Maintanance Pada Mesin Drilling Koch Di Pt. Xyz. Computer and Science Industrial Engineering”, 04. 2022.

Adolph, R., “PENERAPAN PREVENTIVE MAINTENANCE UNTUK MENINGKATKAN KINERJA FASILITAS PRAKTIK LABORATORIUM PRODI PENDIDIKAN TEKNIK MESIN UNDANA” Damianus. 3(4), 1–23, 2016.

Erawadi, D., Artono, T., Rianza, I. N., Hendra, Adriansyah, & Halim, A, “Penentuan Interval Waktu Preventive Maintenance Mesin Dengan Tindakan Berdasarkan Metode Reliability Centered Maintenance (RCM) Pada PT PLN (Persero) UPK Bukittinggi”, Jurnal Teknologi MEDIA PERSPEKTIF, 14(1), 41–55, 2022.

Untung Saputra, Rahmat Aprian Arif, Safar Dune, and La Ode Savirno, “Sistem Perawatan pada Mesin Pembangkit/Genset pada PT. Menara Bosowa Menggunakan Metode Running test”, Piston-JT, vol. 8, no. 2, pp. 35–45, Dec. 2023.

Ahmad Zamawi Ghozali, Annisa Kesy Garside, & Rahmad Wisnu Wardana, “Usulan Perawatan Mesin Dengan Menggunakan Metode Modularity Design Pada PT. Varia Usaha Beton”. Jurnal Teknik Industri, 13(1), 62–68, 2023.https://doi.org/10.25105/jti.v13i1.17515

YUNUS, H. “PERAWATAN MESIN PRESS SECARA PREVENTIVE MAINTENANCE DENGAN MODULARITY DESIGN PADA PERUSAHAAN IWAKURA SEISHAKUSHO. CO.,Ltd”,. Jurusan D-111 Teknik Mesin, 2024.

Julianingsih Julianingsih, & Willyanto Anggono, “PREVENTIVE MAINTENANCE SYSTEM DENGAN MODULARITY DESIGN SEBAGAI SOLUSI PENURUNAN BIAYA MAINTAINANCE (Studi Kasus di Perusahaan Tepung Ikan)”, Jurnal Teknik Industri, 7(1), 61–75, 2005.

Published

2025-06-16

How to Cite

[1]
Hisyam, M. Farisman, Jusman, R. R. Sisworo, and Aminur, “Perawatan dan Perbaikan dengan Pengelasan Teknologi Robotik secara Preventive maintenance dengan Modulary Design”, Piston-JT, vol. 10, no. 1, pp. 19–27, Jun. 2025.

Issue

Section

Articles